Shell Recharge EV Waitrose - Whetstone
Type 2 · 7 kW100% reliability0 of 6 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at Shell Recharge EV Waitrose - Whetstone?
The operator's published price is £0.79/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Shell Recharge EV Waitrose - Whetstone?
Up to 120 kW DC via CHAdeMO, Type 2, CCS.
How many charging sockets does Shell Recharge EV Waitrose - Whetstone have?
8 charging sockets: 1 × 60 kW CHAdeMO, 6 × 7 kW Type 2, 1 × 120 kW CCS. Live per-socket availability is shown on this page.
Is Shell Recharge EV Waitrose - Whetstone open 24/7?
Yes - Shell Recharge EV Waitrose - Whetstone is open 24 hours a day, 7 days a week.
When is Shell Recharge EV Waitrose - Whetstone busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 3 pm and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is Shell Recharge EV Waitrose - Whetstone?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 200 observed charging sessions.
Who operates Shell Recharge EV Waitrose - Whetstone?
Shell Recharge EV Waitrose - Whetstone is on the Shell Recharge network.
How long does a Tesla Model Y Long Range take to charge at Shell Recharge EV Waitrose - Whetstone?
A typical 10–80% rapid charge takes about 31 min on the 120 kW CCS here, adding roughly 55 kWh (~£44 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Shell Recharge EV Waitrose - Whetstone?
A typical 10–80% rapid charge takes about 26 min on the 120 kW CCS here, adding roughly 40 kWh (~£32 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Shell Recharge EV Waitrose - Whetstone?
A typical 10–80% rapid charge takes about 40 min on the 120 kW CCS here, adding roughly 51 kWh (~£40 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.