Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 14 Feb 2022

Totteridge and Whetstone Underground Station - Taxi charger · ESB Energy

Totteridge Lane, N20 9QJ
Rate this charger
Network: ESB Energy
Always check directly with the charge point operator for the most up-to-date information.
Connectors
CHAdeMO50 kW1 socket
CCS50 kW1 socket
Location info
AccessCustomers only
Getting thereIntended for Taxi use only by TfL. Daily parking charges may apply (beyond ANPR cameras). Operated by ESB
Reviews
No reviews yet - be the first to review this charger.
Common questions
How fast is charging at Totteridge and Whetstone Underground Station - Taxi charger · ESB Energy?

Up to 50 kW DC via CHAdeMO, CCS.

How many charging sockets does Totteridge and Whetstone Underground Station - Taxi charger · ESB Energy have?

1 charging socket: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.

Who operates Totteridge and Whetstone Underground Station - Taxi charger · ESB Energy?

Totteridge and Whetstone Underground Station - Taxi charger · ESB Energy is on the ESB Energy network. For site issues, the operator lists +44 345 609 0372.

Can anyone charge at Totteridge and Whetstone Underground Station - Taxi charger · ESB Energy?

The operator lists this charger for customers of the site.

How long does a Tesla Model Y Long Range take to charge at Totteridge and Whetstone Underground Station - Taxi charger · ESB Energy?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Totteridge and Whetstone Underground Station - Taxi charger · ESB Energy?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Totteridge and Whetstone Underground Station - Taxi charger · ESB Energy?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min

Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 14 Feb 2022