Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 7 Dec 2023

1085 High Road

1085 High Road, N12 0EY
Rate this charger
Connectors
CHAdeMO22 kW1 socket
Type 225 kW1 socket
Location info
AccessPublic · pay at location
Reviews
No reviews yet - be the first to review this charger.
Common questions
How fast is charging at 1085 High Road?

Up to 25 kW DC via CHAdeMO, Type 2.

How many charging sockets does 1085 High Road have?

2 charging sockets: 1 × 22 kW CHAdeMO, 1 × 25 kW Type 2.

How long does a Tesla Model Y Long Range take to charge at 1085 High Road?

A typical 10–80% rapid charge takes about 2h 20m on the 25 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 1085 High Road?

A typical 10–80% rapid charge takes about 1h 41m on the 25 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at 1085 High Road?

A typical 10–80% rapid charge takes about 2h 9m on the 25 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 25 kW Type 2~2h 20m
Tesla Model 3 Rear-Wheel Drive 10–80% · 25 kW Type 2~1h 41m
Audi Q4 e-tron 50 10–80% · 25 kW Type 2~2h 9m
Hyundai IONIQ 5 10–80% · 25 kW Type 2~2h 8m
MG Motor MG4 Trophy 10–80% · 25 kW Type 2~1h 48m
Hyundai Kona Electric Long Range 10–80% · 25 kW Type 2~1h 43m
Nissan LEAF 10–80% · 25 kW Type 2~76 min

Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 7 Dec 2023