Wkw Engineering
Type 2 · 22 kW99% reliability2 of 2 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How fast is charging at Wkw Engineering?
Up to 22 kW AC via Type 2.
How many charging sockets does Wkw Engineering have?
2 charging sockets: 2 × 22 kW Type 2. Live per-socket availability is shown on this page.
Is Wkw Engineering open 24/7?
Yes - Wkw Engineering is open 24 hours a day, 7 days a week.
When is Wkw Engineering busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 7 pm and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is Wkw Engineering?
Amp Map measured 99.2% uptime here from recorded live status over the last 30 days, across 11 observed charging sessions.
Who operates Wkw Engineering?
Wkw Engineering is on the WKW ENGINEERING network.
How long does a Tesla Model Y Long Range take to charge at Wkw Engineering?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Wkw Engineering?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Wkw Engineering?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.