Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 4 Oct 2020

St Johns Lane Car Park · GeniePoint

St. Johns Lane, HX1 2JD
Rate this charger
Network: GeniePoint
Always check directly with the charge point operator for the most up-to-date information.
Connectors
Type 222 kW1 socket
CHAdeMO50 kW2 sockets
CCS50 kW2 sockets
Location info
Pricecompletely free to use until 29th October 2021.
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
AccessPublic · membership required · access key required
NotesEngie rapid charger, 50kW DC, AC is a 22kW Socket. One bay for general use, one bay for taxis. Both Free to charge. Please register at : ev.engie.co.uk
Getting thereCar Park Charges : Monday to Saturday 08:00am till 18:00pm Up to 1 hour £1.00 Up to 2 hours £2.00 Up to 3 hours £3.00 Up to 4 hours £4.00 ( 4hrs Max Stay)
Facilities
Car park
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at St Johns Lane Car Park · GeniePoint?

The operator's published price is completely free to use until 29th October 2021.. Prices come from the operator's own data feed and can change.

How fast is charging at St Johns Lane Car Park · GeniePoint?

Up to 50 kW DC via Type 2, CHAdeMO, CCS.

How many charging sockets does St Johns Lane Car Park · GeniePoint have?

2 charging sockets: 1 × 22 kW Type 2, 2 × 50 kW CHAdeMO, 2 × 50 kW CCS.

Who operates St Johns Lane Car Park · GeniePoint?

St Johns Lane Car Park · GeniePoint is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.

How long does a Tesla Model Y Long Range take to charge at St Johns Lane Car Park · GeniePoint?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at St Johns Lane Car Park · GeniePoint?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at St Johns Lane Car Park · GeniePoint?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min

Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 4 Oct 2020