Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Available · 10 of 12VerifiedSource EV supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

Motherwell, Maxim Park · Source EV

Maxim Park, ML1 4WQ · Open 24h
Rate this charger
Network: Source EV
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
CCS · 160 kW100% reliability2 of 3 available
SGB0067-CCS1100% reliabilityCharging
SGB0068-CCS1100% reliabilityAvailable
SGB0068-CCS2100% reliabilityAvailable
SGB0067-CCS2CHAdeMO · 100 kW100% reliabilityAvailable
CCS · 150 kW100% reliability7 of 8 available
SGB0069-CCS1100% reliabilityAvailable
SGB0069-CCS2100% reliabilityAvailable
SGB0070-CCS1100% reliabilityCharging
SGB0070-CCS2100% reliabilityAvailable
SGB0071-CCS1100% reliabilityAvailable
SGB0071-CCS2100% reliabilityAvailable
SGB0072-CCS1100% reliabilityAvailable
SGB0072-CCS2100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
Price£0.89/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
HoursOpen 24 hours
PaymentCredit cardApp start/stopRFID card
6am9am12pm3pm6pm9pm
From live status history · busiest around 11am
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Motherwell, Maxim Park · Source EV?

The operator's published price is £0.89/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at Motherwell, Maxim Park · Source EV?

Up to 160 kW DC via CCS, CHAdeMO.

How many charging sockets does Motherwell, Maxim Park · Source EV have?

12 charging sockets: 8 × 150 kW CCS, 3 × 160 kW CCS, 1 × 100 kW CHAdeMO. Live per-socket availability is shown on this page.

Is Motherwell, Maxim Park · Source EV open 24/7?

Yes - Motherwell, Maxim Park · Source EV is open 24 hours a day, 7 days a week.

When is Motherwell, Maxim Park · Source EV busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Motherwell, Maxim Park · Source EV?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 357 observed charging sessions.

Who operates Motherwell, Maxim Park · Source EV?

Motherwell, Maxim Park · Source EV is on the Source EV network.

How long does a Tesla Model Y Long Range take to charge at Motherwell, Maxim Park · Source EV?

A typical 10–80% rapid charge takes about 26 min on the 160 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Motherwell, Maxim Park · Source EV?

A typical 10–80% rapid charge takes about 23 min on the 160 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Motherwell, Maxim Park · Source EV?

A typical 10–80% rapid charge takes about 39 min on the 160 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 160 kW CCS~26 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 160 kW CCS~23 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 160 kW CCS~39 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 160 kW CCS~22 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 160 kW CCS~30 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 160 kW CCS~39 min · ≈ 41 kWh · ~£36
Nissan LEAF 10–80% · 100 kW CHAdeMO~54 min · ≈ 28 kWh · ~£25

Estimates assume a typical charge curve and a warm battery.

Data: Source EV · synced 13 Oct 2026