Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 16 Apr 2020

Maxim Park, Euro Central Industrial Estate · Chargeplace Scotland

Maxim Park, Euro Central Industrial Estate, ML1 4WQ
Rate this charger
Always check directly with the charge point operator for the most up-to-date information.
Connectors
Type 243 kW2 sockets
CHAdeMO50 kW2 sockets
CCS50 kW2 sockets
Type 27 kW4 sockets
Location info
PriceFree
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
AccessPublic · membership required · access key required
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Maxim Park, Euro Central Industrial Estate · Chargeplace Scotland?

The operator's published price is Free. Prices come from the operator's own data feed and can change.

How fast is charging at Maxim Park, Euro Central Industrial Estate · Chargeplace Scotland?

Up to 50 kW DC via Type 2, CHAdeMO, CCS.

How many charging sockets does Maxim Park, Euro Central Industrial Estate · Chargeplace Scotland have?

4 charging sockets: 2 × 43 kW Type 2, 2 × 50 kW CHAdeMO, 2 × 50 kW CCS, 4 × 7 kW Type 2.

Who operates Maxim Park, Euro Central Industrial Estate · Chargeplace Scotland?

Maxim Park, Euro Central Industrial Estate · Chargeplace Scotland is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

How long does a Tesla Model Y Long Range take to charge at Maxim Park, Euro Central Industrial Estate · Chargeplace Scotland?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Maxim Park, Euro Central Industrial Estate · Chargeplace Scotland?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Maxim Park, Euro Central Industrial Estate · Chargeplace Scotland?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min

Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 16 Apr 2020