Mid Kent Shopping Centre · POGO
CCS · 200 kW100% reliability7 of 8 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at Mid Kent Shopping Centre · POGO?
The operator's published price is £0.65/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Mid Kent Shopping Centre · POGO?
Up to 200 kW DC via CCS.
How many charging sockets does Mid Kent Shopping Centre · POGO have?
8 charging sockets: 8 × 200 kW CCS. Live per-socket availability is shown on this page.
When is Mid Kent Shopping Centre · POGO busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 2 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is Mid Kent Shopping Centre · POGO?
Amp Map measured 99.7% uptime here from recorded live status over the last 30 days, across 337 observed charging sessions.
Who operates Mid Kent Shopping Centre · POGO?
Mid Kent Shopping Centre · POGO is on the POGO network.
How long does a Tesla Model Y Long Range take to charge at Mid Kent Shopping Centre · POGO?
A typical 10–80% rapid charge takes about 23 min on the 200 kW CCS here, adding roughly 55 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Mid Kent Shopping Centre · POGO?
A typical 10–80% rapid charge takes about 23 min on the 200 kW CCS here, adding roughly 40 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Mid Kent Shopping Centre · POGO?
A typical 10–80% rapid charge takes about 39 min on the 200 kW CCS here, adding roughly 51 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.