Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Available · 7 of 10VerifiedOsprey supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

Fields at Aylesford, Maidstone · Osprey Charging

St Laurence Avenue, ME16 0ZP · Open 24h
Rate this charger
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
CCS · 200 kW100% reliability2 of 4 available
30802-1100% reliabilityAvailable
30802-2100% reliabilityCharging
30802-3100% reliabilityAvailable
30802-4100% reliabilityCharging
CCS · 50 kW100% reliability2 of 2 available
#5100% reliabilityAvailable
#8100% reliabilityAvailable
CHAdeMO · 50 kW72% reliability1 of 2 available
#6100% reliabilityAvailable
#946% reliabilityOut of order
Type 2 · 16 kW100% reliability2 of 2 available
#7100% reliabilityAvailable
#10100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
Price£0.89/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
HoursOpen 24 hours
ParkingCar park
PaymentCredit cardApp start/stopRFID card
Getting thereNo Parking Restrictions No Height Restriction No Customer Input Required
Facilities
Restaurant
6am9am12pm3pm6pm9pm
From live status history · busiest around 3pm
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Fields at Aylesford, Maidstone · Osprey Charging?

The operator's published price is £0.89/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at Fields at Aylesford, Maidstone · Osprey Charging?

Up to 200 kW DC via CHAdeMO, Type 2, CCS.

How many charging sockets does Fields at Aylesford, Maidstone · Osprey Charging have?

10 charging sockets: 2 × 50 kW CHAdeMO, 2 × 16 kW Type 2, 4 × 200 kW CCS, 2 × 50 kW CCS. Live per-socket availability is shown on this page.

Is Fields at Aylesford, Maidstone · Osprey Charging open 24/7?

Yes - Fields at Aylesford, Maidstone · Osprey Charging is open 24 hours a day, 7 days a week.

When is Fields at Aylesford, Maidstone · Osprey Charging busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 3 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Fields at Aylesford, Maidstone · Osprey Charging?

Amp Map measured 94.6% uptime here from recorded live status over the last 30 days, across 570 observed charging sessions.

Who operates Fields at Aylesford, Maidstone · Osprey Charging?

Fields at Aylesford, Maidstone · Osprey Charging is on the Osprey Charging network.

How long does a Tesla Model Y Long Range take to charge at Fields at Aylesford, Maidstone · Osprey Charging?

A typical 10–80% rapid charge takes about 23 min on the 200 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Fields at Aylesford, Maidstone · Osprey Charging?

A typical 10–80% rapid charge takes about 23 min on the 200 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Fields at Aylesford, Maidstone · Osprey Charging?

A typical 10–80% rapid charge takes about 39 min on the 200 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 200 kW CCS~23 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 200 kW CCS~23 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 200 kW CCS~39 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 200 kW CCS~19 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 200 kW CCS~30 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 200 kW CCS~39 min · ≈ 41 kWh · ~£36
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£25

Estimates assume a typical charge curve and a warm battery.

Data: Osprey · synced 13 Oct 2026