Pod Point UK1
Type 2 · 7 kW70% reliability4 of 17 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at Pod Point UK1?
The operator's published price is £0.28/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Pod Point UK1?
Up to 7 kW AC via Type 2.
How many charging sockets does Pod Point UK1 have?
17 charging sockets: 17 × 7 kW Type 2. Live per-socket availability is shown on this page.
When is Pod Point UK1 busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is Pod Point UK1?
Amp Map measured 83.5% uptime here from recorded live status over the last 30 days, across 368 observed charging sessions.
Who operates Pod Point UK1?
Pod Point UK1 is on the Pod Point network.
How long does a Tesla Model Y Long Range take to charge at Pod Point UK1?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£15 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point UK1?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£11 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Pod Point UK1?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£14 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.