Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Available · 5 of 16VerifiedIonity supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 29 Oct 2026

IONITY GmbH IONITY Leeds Skelton Lakes

M1 J45 Skelton Lake, LS9 0AS · Open 24h
Rate this charger
Network: IONITY
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
CCS · 350 kW100% reliability4 of 6 available
01100% reliabilityCharging
02100% reliabilityAvailable
03100% reliabilityAvailable
04100% reliabilityCharging
05100% reliabilityAvailable
06100% reliabilityAvailable
CCS · 400 kW91% reliability1 of 10 available
7180% reliabilityBlocked
7280% reliabilityCharging
7382% reliabilityCharging
7482% reliabilityCharging
7597% reliabilityCharging
76100% reliabilityCharging
77100% reliabilityAvailable
7890% reliabilityCharging
79100% reliabilityCharging
80100% reliabilityCharging

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
Price£0.89/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
HoursOpen 24 hours
Energy100% renewable energy
PaymentContactlessCredit cardDebit cardApp start/stopRFID card
6am9am12pm3pm6pm9pm
From live status history · busiest around 1pm
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at IONITY GmbH IONITY Leeds Skelton Lakes?

The operator's published price is £0.89/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at IONITY GmbH IONITY Leeds Skelton Lakes?

Up to 400 kW DC via CCS.

How many charging sockets does IONITY GmbH IONITY Leeds Skelton Lakes have?

16 charging sockets: 6 × 350 kW CCS, 10 × 400 kW CCS. Live per-socket availability is shown on this page.

Is IONITY GmbH IONITY Leeds Skelton Lakes open 24/7?

Yes - IONITY GmbH IONITY Leeds Skelton Lakes is open 24 hours a day, 7 days a week.

When is IONITY GmbH IONITY Leeds Skelton Lakes busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is IONITY GmbH IONITY Leeds Skelton Lakes?

Amp Map measured 95.1% uptime here from recorded live status over the last 30 days, across 4617 observed charging sessions.

Who operates IONITY GmbH IONITY Leeds Skelton Lakes?

IONITY GmbH IONITY Leeds Skelton Lakes is on the IONITY network.

How long does a Tesla Model Y Long Range take to charge at IONITY GmbH IONITY Leeds Skelton Lakes?

A typical 10–80% rapid charge takes about 21 min on the 400 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at IONITY GmbH IONITY Leeds Skelton Lakes?

A typical 10–80% rapid charge takes about 23 min on the 400 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at IONITY GmbH IONITY Leeds Skelton Lakes?

A typical 10–80% rapid charge takes about 39 min on the 400 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 400 kW CCS~21 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 400 kW CCS~23 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 400 kW CCS~39 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 400 kW CCS~18 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 400 kW CCS~30 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 400 kW CCS~39 min · ≈ 41 kWh · ~£36

Estimates assume a typical charge curve and a warm battery.

Data: Ionity · synced 29 Oct 2026