The Moorings at Myton, Leamington Spa Hub · Osprey Charging
CCS · 300 kW92% reliability8 of 8 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at The Moorings at Myton, Leamington Spa Hub · Osprey Charging?
The operator's published price is £0.89/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at The Moorings at Myton, Leamington Spa Hub · Osprey Charging?
Up to 300 kW DC via CCS.
How many charging sockets does The Moorings at Myton, Leamington Spa Hub · Osprey Charging have?
8 charging sockets: 8 × 300 kW CCS. Live per-socket availability is shown on this page.
Is The Moorings at Myton, Leamington Spa Hub · Osprey Charging open 24/7?
Yes - The Moorings at Myton, Leamington Spa Hub · Osprey Charging is open 24 hours a day, 7 days a week.
When is The Moorings at Myton, Leamington Spa Hub · Osprey Charging busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 5 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is The Moorings at Myton, Leamington Spa Hub · Osprey Charging?
Amp Map measured 91.8% uptime here from recorded live status over the last 30 days, across 261 observed charging sessions.
Who operates The Moorings at Myton, Leamington Spa Hub · Osprey Charging?
The Moorings at Myton, Leamington Spa Hub · Osprey Charging is on the Osprey Charging network.
How long does a Tesla Model Y Long Range take to charge at The Moorings at Myton, Leamington Spa Hub · Osprey Charging?
A typical 10–80% rapid charge takes about 21 min on the 300 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Moorings at Myton, Leamington Spa Hub · Osprey Charging?
A typical 10–80% rapid charge takes about 23 min on the 300 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at The Moorings at Myton, Leamington Spa Hub · Osprey Charging?
A typical 10–80% rapid charge takes about 39 min on the 300 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.