Costa Coffee Fold Way, Ashton · Osprey Charging
CCS · 320 kW99% reliability11 of 11 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at Costa Coffee Fold Way, Ashton · Osprey Charging?
The operator's published price is £0.89/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Costa Coffee Fold Way, Ashton · Osprey Charging?
Up to 320 kW DC via CCS.
How many charging sockets does Costa Coffee Fold Way, Ashton · Osprey Charging have?
12 charging sockets: 11 × 320 kW CCS, 1 × 300 kW CCS. Live per-socket availability is shown on this page.
Is Costa Coffee Fold Way, Ashton · Osprey Charging open 24/7?
Yes - Costa Coffee Fold Way, Ashton · Osprey Charging is open 24 hours a day, 7 days a week.
When is Costa Coffee Fold Way, Ashton · Osprey Charging busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is Costa Coffee Fold Way, Ashton · Osprey Charging?
Amp Map measured 99.2% uptime here from recorded live status over the last 30 days, across 260 observed charging sessions.
Who operates Costa Coffee Fold Way, Ashton · Osprey Charging?
Costa Coffee Fold Way, Ashton · Osprey Charging is on the Osprey Charging network.
How long does a Tesla Model Y Long Range take to charge at Costa Coffee Fold Way, Ashton · Osprey Charging?
A typical 10–80% rapid charge takes about 21 min on the 320 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Costa Coffee Fold Way, Ashton · Osprey Charging?
A typical 10–80% rapid charge takes about 23 min on the 320 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Costa Coffee Fold Way, Ashton · Osprey Charging?
A typical 10–80% rapid charge takes about 39 min on the 320 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.