Ash Tree Farm (Ashton-under-Lyne) · evyve
CCS · 240 kW99% reliability7 of 8 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at Ash Tree Farm (Ashton-under-Lyne) · evyve?
The operator's published price is £0.85/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Ash Tree Farm (Ashton-under-Lyne) · evyve?
Up to 240 kW DC via CCS.
How many charging sockets does Ash Tree Farm (Ashton-under-Lyne) · evyve have?
8 charging sockets: 8 × 240 kW CCS. Live per-socket availability is shown on this page.
Is Ash Tree Farm (Ashton-under-Lyne) · evyve open 24/7?
Yes - Ash Tree Farm (Ashton-under-Lyne) · evyve is open 24 hours a day, 7 days a week.
When is Ash Tree Farm (Ashton-under-Lyne) · evyve busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 2 pm and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is Ash Tree Farm (Ashton-under-Lyne) · evyve?
Amp Map measured 99.3% uptime here from recorded live status over the last 30 days, across 483 observed charging sessions.
Who operates Ash Tree Farm (Ashton-under-Lyne) · evyve?
Ash Tree Farm (Ashton-under-Lyne) · evyve is on the evyve network.
How long does a Tesla Model Y Long Range take to charge at Ash Tree Farm (Ashton-under-Lyne) · evyve?
A typical 10–80% rapid charge takes about 22 min on the 240 kW CCS here, adding roughly 55 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Ash Tree Farm (Ashton-under-Lyne) · evyve?
A typical 10–80% rapid charge takes about 23 min on the 240 kW CCS here, adding roughly 40 kWh (~£34 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Ash Tree Farm (Ashton-under-Lyne) · evyve?
A typical 10–80% rapid charge takes about 39 min on the 240 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.