Nene Park Trust
Type 2 · 7 kW95% reliability25 of 26 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How fast is charging at Nene Park Trust?
Up to 7 kW AC via Type 2.
How many charging sockets does Nene Park Trust have?
26 charging sockets: 26 × 7 kW Type 2. Live per-socket availability is shown on this page.
Is Nene Park Trust open 24/7?
Yes - Nene Park Trust is open 24 hours a day, 7 days a week.
When is Nene Park Trust busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 10 pm. The live status on this page shows what is free before you set off.
How reliable is Nene Park Trust?
Amp Map measured 95.3% uptime here from recorded live status over the last 30 days, across 72 observed charging sessions.
Who operates Nene Park Trust?
Nene Park Trust is on the Nene Park Trust network.
How long does a Tesla Model Y Long Range take to charge at Nene Park Trust?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Nene Park Trust?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Nene Park Trust?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.