Westpoint
Type 2 · 22 kW100% reliability9 of 10 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How fast is charging at Westpoint?
Up to 22 kW AC via Type 2.
How many charging sockets does Westpoint have?
10 charging sockets: 10 × 22 kW Type 2. Live per-socket availability is shown on this page.
Is Westpoint open 24/7?
Yes - Westpoint is open 24 hours a day, 7 days a week.
When is Westpoint busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 9 am and quietest around 7 pm. The live status on this page shows what is free before you set off.
How reliable is Westpoint?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 25 observed charging sessions.
Who operates Westpoint?
Westpoint is on the Westpoint network.
How long does a Tesla Model Y Long Range take to charge at Westpoint?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Westpoint?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Westpoint?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.