Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Available · 5 of 8VerifiedBe.EV supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

Chestnut Avenue Retail Park · Be.EV

Chestnut Avenue Retail Park, SO53 3LE · Open 24h
Rate this charger
Network: Be.EV
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
Type 2 · 22 kW100% reliability2 of 2 available
AD00204-1100% reliabilityAvailable
AD00204-2100% reliabilityAvailable
CCS · 150 kW100% reliability2 of 4 available
KM0030-01100% reliabilityCharging
KM0030-02100% reliabilityCharging
KM0030-03100% reliabilityAvailable
KM0030-04100% reliabilityAvailable
CCS · 40 kW100% reliability1 of 2 available
RTM0009-1100% reliabilityAvailable
RTM0009-2100% reliabilityCharging

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
Price
ConnectorPowerPrice
CCS150 kW£0.87/kWh
CCS40 kW£0.77/kWh
Type 222 kW£0.59/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
HoursOpen 24 hours
NoteNo charging outside opening hours
ParkingCar park
PaymentApp start/stop
6am9am12pm3pm6pm9pm
From live status history · busiest around 10am
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Chestnut Avenue Retail Park · Be.EV?

The operator's published price is CCS £0.77/kWh · CCS £0.87/kWh · Type 2 £0.59/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at Chestnut Avenue Retail Park · Be.EV?

Up to 150 kW DC via CCS, Type 2.

How many charging sockets does Chestnut Avenue Retail Park · Be.EV have?

8 charging sockets: 2 × 40 kW CCS, 4 × 150 kW CCS, 2 × 22 kW Type 2. Live per-socket availability is shown on this page.

Is Chestnut Avenue Retail Park · Be.EV open 24/7?

Yes - Chestnut Avenue Retail Park · Be.EV is open 24 hours a day, 7 days a week.

When is Chestnut Avenue Retail Park · Be.EV busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 10 am and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Chestnut Avenue Retail Park · Be.EV?

Amp Map measured 99.9% uptime here from recorded live status over the last 30 days, across 658 observed charging sessions.

Who operates Chestnut Avenue Retail Park · Be.EV?

Chestnut Avenue Retail Park · Be.EV is on the Be.EV network.

How long does a Tesla Model Y Long Range take to charge at Chestnut Avenue Retail Park · Be.EV?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh (~£48 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Chestnut Avenue Retail Park · Be.EV?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh (~£35 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Chestnut Avenue Retail Park · Be.EV?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh (~£44 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 150 kW CCS~27 min · ≈ 55 kWh · ~£48
Tesla Model 3 Rear-Wheel Drive 10–80% · 150 kW CCS~24 min · ≈ 40 kWh · ~£35
Audi Q4 e-tron 50 10–80% · 150 kW CCS~39 min · ≈ 51 kWh · ~£44
Hyundai IONIQ 5 10–80% · 150 kW CCS~23 min · ≈ 51 kWh · ~£44
MG Motor MG4 Trophy 10–80% · 150 kW CCS~30 min · ≈ 43 kWh · ~£37
Hyundai Kona Electric Long Range 10–80% · 150 kW CCS~39 min · ≈ 41 kWh · ~£35
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m · ≈ 28 kWh · ~£17

Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 13 Oct 2026