Channon Road Retail Park · Be.EV
CCS · 300 kW100% reliability2 of 6 available
CHAdeMO · 50 kW100% reliability2 of 2 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
| Connector | Power | Price |
|---|---|---|
| CCS | 300 kW | £0.87/kWh |
| CHAdeMO | 50 kW | £0.77/kWh |
How much does it cost to charge at Channon Road Retail Park · Be.EV?
The operator's published price is CCS £0.87/kWh · CHAdeMO £0.77/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Channon Road Retail Park · Be.EV?
Up to 300 kW DC via CCS, CHAdeMO.
How many charging sockets does Channon Road Retail Park · Be.EV have?
8 charging sockets: 6 × 300 kW CCS, 2 × 50 kW CHAdeMO. Live per-socket availability is shown on this page.
Is Channon Road Retail Park · Be.EV open 24/7?
Yes - Channon Road Retail Park · Be.EV is open 24 hours a day, 7 days a week.
When is Channon Road Retail Park · Be.EV busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is Channon Road Retail Park · Be.EV?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 1169 observed charging sessions.
Who operates Channon Road Retail Park · Be.EV?
Channon Road Retail Park · Be.EV is on the Be.EV network.
How long does a Tesla Model Y Long Range take to charge at Channon Road Retail Park · Be.EV?
A typical 10–80% rapid charge takes about 21 min on the 300 kW CCS here, adding roughly 55 kWh (~£48 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Channon Road Retail Park · Be.EV?
A typical 10–80% rapid charge takes about 23 min on the 300 kW CCS here, adding roughly 40 kWh (~£35 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Channon Road Retail Park · Be.EV?
A typical 10–80% rapid charge takes about 39 min on the 300 kW CCS here, adding roughly 51 kWh (~£44 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.