Lodmoor Car Park · Be.EV
CCS · 150 kW100% reliability5 of 7 available
Type 2 · 22 kW99% reliability4 of 6 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
| Connector | Power | Price |
|---|---|---|
| CCS | 150 kW | £0.87/kWh |
| CHAdeMO | 50 kW | £0.77/kWh |
| Type 2 | 22 kW | £0.59/kWh |
How much does it cost to charge at Lodmoor Car Park · Be.EV?
The operator's published price is Type 2 £0.59/kWh · CCS £0.87/kWh · CHAdeMO £0.77/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Lodmoor Car Park · Be.EV?
Up to 150 kW DC via Type 2, CCS, CHAdeMO.
How many charging sockets does Lodmoor Car Park · Be.EV have?
14 charging sockets: 6 × 22 kW Type 2, 7 × 150 kW CCS, 1 × 50 kW CHAdeMO. Live per-socket availability is shown on this page.
Is Lodmoor Car Park · Be.EV open 24/7?
Yes - Lodmoor Car Park · Be.EV is open 24 hours a day, 7 days a week.
When is Lodmoor Car Park · Be.EV busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 10 pm. The live status on this page shows what is free before you set off.
How reliable is Lodmoor Car Park · Be.EV?
Amp Map measured 99.4% uptime here from recorded live status over the last 30 days, across 228 observed charging sessions.
Who operates Lodmoor Car Park · Be.EV?
Lodmoor Car Park · Be.EV is on the Be.EV network.
How long does a Tesla Model Y Long Range take to charge at Lodmoor Car Park · Be.EV?
A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh (~£48 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Lodmoor Car Park · Be.EV?
A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh (~£35 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Lodmoor Car Park · Be.EV?
A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh (~£44 at the published price). Estimates assume a typical charge curve and a warm battery.