Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Available · 5 of 8VerifiedBe.EV supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

Swannery Car Park · Be.EV

Swannery car park, DT4 7TY
Rate this charger
Network: Be.EV
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
Type 2 · 22 kW58% reliability1 of 4 available
AD00121-1100% reliabilityCharging
AD00121-2100% reliabilityAvailable
AD00975-116% reliabilityOut of order
AD00975-216% reliabilityOut of order
CCS · 50 kW100% reliability4 of 4 available
ALW0036-1100% reliabilityAvailable
ALW0036-2100% reliabilityAvailable
ALW0053-1100% reliabilityAvailable
ALW0053-2100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
Price
ConnectorPowerPrice
CCS50 kW£0.77/kWh
Type 222 kW£0.59/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
HoursOpen 24 hours
NoteNo charging outside opening hours
ParkingCar park
PaymentApp start/stop
Facilities
Car park
6am9am12pm3pm6pm9pm
From live status history · busiest around 11am
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Swannery Car Park · Be.EV?

The operator's published price is Type 2 £0.59/kWh · CCS £0.77/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at Swannery Car Park · Be.EV?

Up to 50 kW DC via Type 2, CCS.

How many charging sockets does Swannery Car Park · Be.EV have?

8 charging sockets: 4 × 22 kW Type 2, 4 × 50 kW CCS. Live per-socket availability is shown on this page.

Is Swannery Car Park · Be.EV open 24/7?

Yes - Swannery Car Park · Be.EV is open 24 hours a day, 7 days a week.

When is Swannery Car Park · Be.EV busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 10 pm. The live status on this page shows what is free before you set off.

How reliable is Swannery Car Park · Be.EV?

Amp Map measured 78.8% uptime here from recorded live status over the last 30 days, across 170 observed charging sessions.

Who operates Swannery Car Park · Be.EV?

Swannery Car Park · Be.EV is on the Be.EV network.

How long does a Tesla Model Y Long Range take to charge at Swannery Car Park · Be.EV?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Swannery Car Park · Be.EV?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Swannery Car Park · Be.EV?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£39 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min · ≈ 55 kWh · ~£43
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min · ≈ 40 kWh · ~£31
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min · ≈ 51 kWh · ~£39
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min · ≈ 51 kWh · ~£39
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min · ≈ 43 kWh · ~£33
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min · ≈ 41 kWh · ~£31
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m · ≈ 28 kWh · ~£17

Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 13 Oct 2026