Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Available · 22 of 30VerifiedGRIDSERVE supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

EH - MOTO Reading Westbound · GRIDSERVE

M4 Westbound, RG30 3UQ · Open 24h
Rate this charger
Network: GRIDSERVE
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
CCS · 35 kW100% reliability3 of 3 available
#1100% reliabilityAvailable
#3100% reliabilityAvailable
#4100% reliabilityAvailable
#2CHAdeMO · 60 kW100% reliabilityAvailable
CCS · 350 kW92% reliability5 of 6 available
#599% reliabilityAvailable
#6100% reliabilityAvailable
#799% reliabilityAvailable
#1252% reliabilityOut of order
#13100% reliabilityAvailable
#14100% reliabilityAvailable
CCS / CHAdeMO · 350 kW100% reliability4 of 6 available
#8100% reliabilityAvailable
#9100% reliabilityAvailable
#10100% reliabilityAvailable
#1199% reliabilityUnavailable
#15100% reliabilityCharging
#1699% reliabilityAvailable
CCS · 360 kW100% reliability7 of 12 available
#17100% reliabilityCharging
#18100% reliabilityAvailable
#19100% reliabilityCharging
#20100% reliabilityAvailable
#21100% reliabilityAvailable
#22100% reliabilityCharging
#23100% reliabilityAvailable
#24100% reliabilityCharging
#2599% reliabilityAvailable
#26100% reliabilityAvailable
#27100% reliabilityAvailable
#28100% reliabilityCharging
Type 2 · 11 kW100% reliability2 of 2 available
#29100% reliabilityAvailable
#30100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
Price
ConnectorPowerPrice
CCS360 kW£0.92/kWh
CCS350 kW£0.92/kWh
CHAdeMO100 kW£0.92/kWh
CHAdeMO60 kW£0.92/kWh
CCS35 kW£0.92/kWh
Type 211 kW£0.59/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
HoursOpen 24 hours
ParkingOn-street
PaymentCredit cardApp start/stopRFID card
Getting thereM4 Westbound between junction 11 and 12
Facilities
HotelRestaurantCaféShoppingSupermarketRecreationFuel stationWi-Fi
6am9am12pm3pm6pm9pm
From live status history · busiest around 12pm
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at EH - MOTO Reading Westbound · GRIDSERVE?

The operator's published price is CCS £0.92/kWh · CHAdeMO £0.92/kWh · CCS £0.92/kWh · CHAdeMO £0.92/kWh · Type 2 £0.59/kWh · CCS £0.92/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at EH - MOTO Reading Westbound · GRIDSERVE?

Up to 360 kW DC via CCS, CHAdeMO, Type 2.

How many charging sockets does EH - MOTO Reading Westbound · GRIDSERVE have?

30 charging sockets: 3 × 35 kW CCS, 1 × 60 kW CHAdeMO, 12 × 350 kW CCS, 6 × 100 kW CHAdeMO, 2 × 11 kW Type 2, 12 × 360 kW CCS. Live per-socket availability is shown on this page.

Is EH - MOTO Reading Westbound · GRIDSERVE open 24/7?

Yes - EH - MOTO Reading Westbound · GRIDSERVE is open 24 hours a day, 7 days a week.

When is EH - MOTO Reading Westbound · GRIDSERVE busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is EH - MOTO Reading Westbound · GRIDSERVE?

Amp Map measured 98.2% uptime here from recorded live status over the last 30 days, across 4190 observed charging sessions.

Who operates EH - MOTO Reading Westbound · GRIDSERVE?

EH - MOTO Reading Westbound · GRIDSERVE is on the GRIDSERVE network.

How long does a Tesla Model Y Long Range take to charge at EH - MOTO Reading Westbound · GRIDSERVE?

A typical 10–80% rapid charge takes about 21 min on the 360 kW CCS here, adding roughly 55 kWh (~£51 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EH - MOTO Reading Westbound · GRIDSERVE?

A typical 10–80% rapid charge takes about 23 min on the 360 kW CCS here, adding roughly 40 kWh (~£37 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at EH - MOTO Reading Westbound · GRIDSERVE?

A typical 10–80% rapid charge takes about 39 min on the 360 kW CCS here, adding roughly 51 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 360 kW CCS~21 min · ≈ 55 kWh · ~£51
Tesla Model 3 Rear-Wheel Drive 10–80% · 360 kW CCS~23 min · ≈ 40 kWh · ~£37
Audi Q4 e-tron 50 10–80% · 360 kW CCS~39 min · ≈ 51 kWh · ~£47
Hyundai IONIQ 5 10–80% · 360 kW CCS~18 min · ≈ 51 kWh · ~£47
MG Motor MG4 Trophy 10–80% · 360 kW CCS~30 min · ≈ 43 kWh · ~£39
Hyundai Kona Electric Long Range 10–80% · 360 kW CCS~39 min · ≈ 41 kWh · ~£37
Nissan LEAF 10–80% · 100 kW CHAdeMO~54 min · ≈ 28 kWh · ~£26

Estimates assume a typical charge curve and a warm battery.

Data: GRIDSERVE · synced 13 Oct 2026