Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Available · 31 of 36VerifiedGRIDSERVE supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

EH - MOTO Reading Eastbound · GRIDSERVE

M4, RG30 3UQ · Open 24h
Rate this charger
Network: GRIDSERVE
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
CCS · 40 kW100% reliability3 of 3 available
#1100% reliabilityAvailable
#3100% reliabilityAvailable
#4100% reliabilityAvailable
#2CHAdeMO · 40 kW100% reliabilityAvailable
CCS · 350 kW99% reliability8 of 12 available
#5100% reliabilityCharging
#6100% reliabilityCharging
#7100% reliabilityAvailable
#8100% reliabilityCharging
#1091% reliabilityAvailable
#12100% reliabilityAvailable
#14100% reliabilityAvailable
#16100% reliabilityAvailable
#17100% reliabilityCharging
#18100% reliabilityAvailable
#19100% reliabilityAvailable
#21100% reliabilityAvailable
CHAdeMO · 100 kW98% reliability6 of 6 available
#9100% reliabilityAvailable
#1190% reliabilityAvailable
#13100% reliabilityAvailable
#15100% reliabilityAvailable
#20100% reliabilityAvailable
#22100% reliabilityAvailable
CCS · 360 kW99% reliability11 of 12 available
#23100% reliabilityAvailable
#2498% reliabilityAvailable
#25100% reliabilityAvailable
#26100% reliabilityAvailable
#27100% reliabilityAvailable
#28100% reliabilityAvailable
#2996% reliabilityAvailable
#3099% reliabilityCharging
#3199% reliabilityAvailable
#32100% reliabilityAvailable
#33100% reliabilityAvailable
#34100% reliabilityAvailable
Type 2 · 11 kW100% reliability2 of 2 available
#35100% reliabilityAvailable
#36100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
Price
ConnectorPowerPrice
CCS360 kW£0.89/kWh
CCS350 kW£0.89/kWh
CHAdeMO100 kW£0.89/kWh
CCS40 kW£0.89/kWh
CHAdeMO40 kW£0.89/kWh
Type 211 kW£0.59/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
HoursOpen 24 hours
ParkingOn-street
PaymentCredit cardApp start/stopRFID card
Getting thereTurn left at the entrance of Greggs and the chargers are a short distance ahead.
Facilities
HotelRestaurantCaféSupermarketWi-Fi
6am9am12pm3pm6pm9pm
From live status history · busiest around 1pm
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at EH - MOTO Reading Eastbound · GRIDSERVE?

The operator's published price is CCS £0.89/kWh · CHAdeMO £0.89/kWh · CCS £0.89/kWh · CHAdeMO £0.89/kWh · Type 2 £0.59/kWh · CCS £0.89/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at EH - MOTO Reading Eastbound · GRIDSERVE?

Up to 360 kW DC via CCS, CHAdeMO, Type 2.

How many charging sockets does EH - MOTO Reading Eastbound · GRIDSERVE have?

36 charging sockets: 3 × 40 kW CCS, 1 × 40 kW CHAdeMO, 12 × 350 kW CCS, 6 × 100 kW CHAdeMO, 2 × 11 kW Type 2, 12 × 360 kW CCS. Live per-socket availability is shown on this page.

Is EH - MOTO Reading Eastbound · GRIDSERVE open 24/7?

Yes - EH - MOTO Reading Eastbound · GRIDSERVE is open 24 hours a day, 7 days a week.

When is EH - MOTO Reading Eastbound · GRIDSERVE busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is EH - MOTO Reading Eastbound · GRIDSERVE?

Amp Map measured 99.2% uptime here from recorded live status over the last 30 days, across 3819 observed charging sessions.

Who operates EH - MOTO Reading Eastbound · GRIDSERVE?

EH - MOTO Reading Eastbound · GRIDSERVE is on the GRIDSERVE network.

How long does a Tesla Model Y Long Range take to charge at EH - MOTO Reading Eastbound · GRIDSERVE?

A typical 10–80% rapid charge takes about 21 min on the 360 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EH - MOTO Reading Eastbound · GRIDSERVE?

A typical 10–80% rapid charge takes about 23 min on the 360 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at EH - MOTO Reading Eastbound · GRIDSERVE?

A typical 10–80% rapid charge takes about 39 min on the 360 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 360 kW CCS~21 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 360 kW CCS~23 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 360 kW CCS~39 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 360 kW CCS~18 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 360 kW CCS~30 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 360 kW CCS~39 min · ≈ 41 kWh · ~£36
Nissan LEAF 10–80% · 100 kW CHAdeMO~54 min · ≈ 28 kWh · ~£25

Estimates assume a typical charge curve and a warm battery.

Data: GRIDSERVE · synced 13 Oct 2026