Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Available · 6 of 11VerifiedBP Pulse supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 29 Oct 2026

Toton Lane Tram park & ride · BP Pulse

Toton Lane Tram park & ride, 320 Toton Lane, NG9 7JB
Rate this charger
Network: BP Pulse
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
Type 2 · 7 kW27% reliability3 of 8 available
108440% reliabilityOut of order
11034100% reliabilityAvailable
110352% reliabilityOut of order
110352% reliabilityOut of order
110360% reliabilityOut of order
110360% reliabilityOut of order
11037100% reliabilityAvailable
11037100% reliabilityAvailable
Type 2 · 4 kW100% reliability2 of 2 available
11038100% reliabilityAvailable
11038100% reliabilityAvailable
24481CCS / CHAdeMO / Type 2 · 50 kW100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
Price
ConnectorPowerPrice
CCS50 kW£0.89/kWh
CHAdeMO50 kW£0.89/kWh
Type 225 kW£0.89/kWh
Type 27 kW£0.65/kWh
Type 24 kW£0.65/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
NoteNo charging outside opening hours
PaymentApp start/stopRFID card
6am9am12pm3pm6pm9pm
From live status history · busiest around 9am
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Toton Lane Tram park & ride · BP Pulse?

The operator's published price is CCS £0.89/kWh · CHAdeMO £0.89/kWh · Type 2 £0.89/kWh · Type 2 £0.65/kWh · Type 2 £0.65/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at Toton Lane Tram park & ride · BP Pulse?

Up to 50 kW DC via CCS, CHAdeMO, Type 2.

How many charging sockets does Toton Lane Tram park & ride · BP Pulse have?

11 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 25 kW Type 2, 8 × 7 kW Type 2, 2 × 4 kW Type 2. Live per-socket availability is shown on this page.

When is Toton Lane Tram park & ride · BP Pulse busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Toton Lane Tram park & ride · BP Pulse?

Amp Map measured 46.3% uptime here from recorded live status over the last 30 days, across 26 observed charging sessions.

Who operates Toton Lane Tram park & ride · BP Pulse?

Toton Lane Tram park & ride · BP Pulse is on the BP Pulse network.

How long does a Tesla Model Y Long Range take to charge at Toton Lane Tram park & ride · BP Pulse?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Toton Lane Tram park & ride · BP Pulse?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Toton Lane Tram park & ride · BP Pulse?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min · ≈ 41 kWh · ~£36
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£25

Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 29 Oct 2026