Tingley Interchange · BP Pulse
CCS · 300 kW99% reliability18 of 20 available
CHAdeMO · 100 kW99% reliability10 of 10 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at Tingley Interchange · BP Pulse?
The operator's published price is £0.89/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Tingley Interchange · BP Pulse?
Up to 300 kW DC via CCS, CHAdeMO.
How many charging sockets does Tingley Interchange · BP Pulse have?
30 charging sockets: 20 × 300 kW CCS, 10 × 100 kW CHAdeMO. Live per-socket availability is shown on this page.
Is Tingley Interchange · BP Pulse open 24/7?
Yes - Tingley Interchange · BP Pulse is open 24 hours a day, 7 days a week.
When is Tingley Interchange · BP Pulse busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 2 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is Tingley Interchange · BP Pulse?
Amp Map measured 98.7% uptime here from recorded live status over the last 30 days, across 848 observed charging sessions.
Who operates Tingley Interchange · BP Pulse?
Tingley Interchange · BP Pulse is on the BP Pulse network.
How long does a Tesla Model Y Long Range take to charge at Tingley Interchange · BP Pulse?
A typical 10–80% rapid charge takes about 21 min on the 300 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Tingley Interchange · BP Pulse?
A typical 10–80% rapid charge takes about 23 min on the 300 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Tingley Interchange · BP Pulse?
A typical 10–80% rapid charge takes about 39 min on the 300 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.