Pod Point Manning Stainton - Leeds
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at Pod Point Manning Stainton - Leeds?
The operator's published price is £0.29/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Pod Point Manning Stainton - Leeds?
Up to 7 kW AC via Type 2.
How many charging sockets does Pod Point Manning Stainton - Leeds have?
1 charging socket: 1 × 7 kW Type 2. Live per-socket availability is shown on this page.
How reliable is Pod Point Manning Stainton - Leeds?
Amp Map measured 0% uptime here from recorded live status over the last 30 days.
Who operates Pod Point Manning Stainton - Leeds?
Pod Point Manning Stainton - Leeds is on the Pod Point network.
How long does a Tesla Model Y Long Range take to charge at Pod Point Manning Stainton - Leeds?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£16 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Manning Stainton - Leeds?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£11 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Pod Point Manning Stainton - Leeds?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£15 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.