Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Available · 8 of 8VerifiedBe.EV supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 13 Oct 2026

Melcombe Regis Car Park · Be.EV

Melcombe Regis car park, DT4 7DW
Rate this charger
Network: Be.EV
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
Type 2 · 22 kW100% reliability4 of 4 available
AD00120-1100% reliabilityAvailable
AD00120-2100% reliabilityAvailable
AD00974-1100% reliabilityAvailable
AD00974-2100% reliabilityAvailable
CCS · 120 kW100% reliability2 of 2 available
KM0083-01100% reliabilityAvailable
KM0083-02100% reliabilityAvailable
KM0083-03CHAdeMO · 50 kW100% reliabilityAvailable
KM0083-04CCS · 80 kW100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
Price£0.89/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
HoursOpen 24 hours
NoteNo charging outside opening hours
ParkingCar park
PaymentApp start/stop
Facilities
Car park
6am9am12pm3pm6pm9pm
From live status history · busiest around 12pm
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Melcombe Regis Car Park · Be.EV?

The operator's published price is £0.89/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at Melcombe Regis Car Park · Be.EV?

Up to 120 kW DC via Type 2, CHAdeMO, CCS.

How many charging sockets does Melcombe Regis Car Park · Be.EV have?

8 charging sockets: 4 × 22 kW Type 2, 1 × 50 kW CHAdeMO, 2 × 120 kW CCS, 1 × 80 kW CCS. Live per-socket availability is shown on this page.

Is Melcombe Regis Car Park · Be.EV open 24/7?

Yes - Melcombe Regis Car Park · Be.EV is open 24 hours a day, 7 days a week.

When is Melcombe Regis Car Park · Be.EV busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Melcombe Regis Car Park · Be.EV?

Amp Map measured 99.9% uptime here from recorded live status over the last 30 days, across 142 observed charging sessions.

Who operates Melcombe Regis Car Park · Be.EV?

Melcombe Regis Car Park · Be.EV is on the Be.EV network.

How long does a Tesla Model Y Long Range take to charge at Melcombe Regis Car Park · Be.EV?

A typical 10–80% rapid charge takes about 31 min on the 120 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Melcombe Regis Car Park · Be.EV?

A typical 10–80% rapid charge takes about 26 min on the 120 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Melcombe Regis Car Park · Be.EV?

A typical 10–80% rapid charge takes about 40 min on the 120 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 120 kW CCS~31 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 120 kW CCS~26 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 120 kW CCS~40 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 120 kW CCS~27 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 120 kW CCS~32 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 120 kW CCS~39 min · ≈ 41 kWh · ~£36
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£25

Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 13 Oct 2026