Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map

2025 VinFast VF 7

Charge times & specs

Specs

Usable battery75.3 kWh
Battery chemistryLi-ion
Peak DC rate150 kW
Peak AC rate11 kW
Charging architecture400 V
Range (WLTP, approx.)280 mi · 450 km
Efficiency (approx.)3.7 mi/kWh · 6.0 km/kWh
Charge-port locationRear right
DrivetrainFront-wheel drive
Power150 kW
ConnectorsCCSType 2

How long does the 2025 VinFast VF 7 take to charge?

AC 7.4 kW · 0–100% at 7.4 kW10 h 11 min
AC 22 kW · 0–100% at 11 kW6 h 51 min
Rapid 50 kW · 10–80% at up to 50 kW~67 min
Ultra-rapid 150 kW · 10–80% at up to 150 kW~34 min
Ultra-rapid 350 kW · 10–80% at up to 150 kW~34 min

Estimates assume a typical charge curve and a warm battery - cold weather, a nearly-full battery, or a busy shared unit can slow things down.

What does it cost to charge?

Enter your home tariff or a charger's listed rate - costs follow your number and the car's usable battery; per-mile uses the rated range.

Specs: VinFast VF 7 Official Specifications · via OpenEV Data

Other model years: 2024

VinFast - All vehicles