Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map

2025 NIO ET9

Charge times & specs

Specs

Usable battery111 kWh
Battery chemistryNMC
Peak DC rate500 kW
Peak AC rate11 kW
Charging architecture800 V
Range (CLTC, approx.)404 mi · 650 km
Efficiency (approx.)3.6 mi/kWh · 5.9 km/kWh
Charge-port locationRear right
Heat pumpYes
DrivetrainAll-wheel drive
Power520 kW
0–62 mph3.9 s
Kerb weight2,550 kg
ConnectorsCCSType 2GB/T

How long does the 2025 NIO ET9 take to charge?

AC 7.4 kW · 0–100% at 7.4 kW15 h
AC 22 kW · 0–100% at 11 kW10 h 5 min
Rapid 50 kW · 10–80% at up to 50 kW~98 min
Ultra-rapid 150 kW · 10–80% at up to 150 kW~33 min
Ultra-rapid 350 kW · 10–80% at up to 350 kW~15 min

Estimates assume a typical charge curve and a warm battery - cold weather, a nearly-full battery, or a busy shared unit can slow things down.

What does it cost to charge?

Enter your home tariff or a charger's listed rate - costs follow your number and the car's usable battery; per-mile uses the rated range.

Specs: NIO ET9 Official Specifications · via OpenEV Data

NIO - All vehicles