Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map

2025 Lucid Air Pure

Charge times & specs

Specs

Usable battery88 kWh
Battery chemistryLi-ion
Peak DC rate300 kW
Peak AC rate19.2 kW
Charging architecture800 V
Range (EPA, approx.)425 mi · 684 km
Efficiency (approx.)4.8 mi/kWh · 7.8 km/kWh
Charge-port locationRear left
Plug & ChargeYes
Heat pumpYes
DrivetrainAll-wheel drive
Power462 kW
0–62 mph3.4 s
Kerb weight2,150 kg
ConnectorsCCSJ-1772

How long does the 2025 Lucid Air Pure take to charge?

AC 7.4 kW · 0–100% at 7.4 kW11 h 54 min
AC 22 kW · 0–100% at 19.2 kW4 h 35 min
Rapid 50 kW · 10–80% at up to 50 kW~78 min
Ultra-rapid 150 kW · 10–80% at up to 150 kW~26 min
Ultra-rapid 350 kW · 10–80% at up to 300 kW~16 min

Estimates assume a typical charge curve and a warm battery - cold weather, a nearly-full battery, or a busy shared unit can slow things down.

What does it cost to charge?

Enter your home tariff or a charger's listed rate - costs follow your number and the car's usable battery; per-mile uses the rated range.

Specs: Lucid Air Touring Official Specifications · via OpenEV Data

Other model years: 2024 · 2023

Lucid - All vehicles