Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map

2025 GAC Aion Aion V

Charge times & specs

Specs

Usable battery75.2 kWh
Battery chemistryLFP
Peak DC rate100 kW
Peak AC rate7.2 kW
Charging architecture400 V
Range (WLTP, approx.)280 mi · 450 km
Efficiency (approx.)3.7 mi/kWh · 6.0 km/kWh
Charge-port locationRear right
DrivetrainFront-wheel drive
Power150 kW
0–62 mph7.9 s
Kerb weight1,810 kg
ConnectorsCCSType 2

LFP packs are happy being charged to 100% regularly - no need to stop at 80% for battery health.

How long does the 2025 GAC Aion Aion V take to charge?

AC 7.4 kW · 0–100% at 7.2 kW10 h 27 min
AC 22 kW · 0–100% at 7.2 kW10 h 27 min
Rapid 50 kW · 10–80% at up to 50 kW~72 min
Ultra-rapid 150 kW · 10–80% at up to 100 kW~51 min
Ultra-rapid 350 kW · 10–80% at up to 100 kW~51 min

Estimates assume a typical charge curve and a warm battery - cold weather, a nearly-full battery, or a busy shared unit can slow things down.

What does it cost to charge?

Enter your home tariff or a charger's listed rate - costs follow your number and the car's usable battery; per-mile uses the rated range.

Specs: GAC Aion V 2025 Official Specifications · via OpenEV Data

Other model years: 2024 · 2023

GAC Aion - All vehicles