Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map

2025 Chevrolet Silverado EV WT

Charge times & specs

Specs

Usable battery200 kWh
Battery chemistryLi-ion
Peak DC rate350 kW
Peak AC rate19.2 kW
Charging architecture800 V
Range (EPA, approx.)450 mi · 724 km
Efficiency (approx.)2.2 mi/kWh · 3.6 km/kWh
Charge-port locationFront left
DrivetrainAll-wheel drive
Power510 kW
Kerb weight3,629 kg
ConnectorsCCSJ-1772

How long does the 2025 Chevrolet Silverado EV WT take to charge?

AC 7.4 kW · 0–100% at 7.4 kW27 h 2 min
AC 22 kW · 0–100% at 19.2 kW10 h 25 min
Rapid 50 kW · 10–80% at up to 50 kW~177 min
Ultra-rapid 150 kW · 10–80% at up to 150 kW~59 min
Ultra-rapid 350 kW · 10–80% at up to 350 kW~32 min

Estimates assume a typical charge curve and a warm battery - cold weather, a nearly-full battery, or a busy shared unit can slow things down.

What does it cost to charge?

Enter your home tariff or a charger's listed rate - costs follow your number and the car's usable battery; per-mile uses the rated range.

Specs: 2025 Chevrolet Silverado EV Specifications · via OpenEV Data

Other model years: 2024

Chevrolet - All vehicles