2025 Chery Tiggo 7 Pro PHEV
Charge times & specs
Specs
PowertrainPlug-in hybrid
Usable battery19 kWh
Battery chemistryLFP
Peak DC rate50 kW
Peak AC rate3.3 kW
Charging architecture400 V
Electric range (NEDC, approx.)34 mi · 54 km
Efficiency (approx.)1.8 mi/kWh · 2.8 km/kWh
Charge-port locationRear left
DrivetrainAll-wheel drive
Power233 kW
0–62 mph7.2 s
ConnectorsType 2
LFP packs are happy being charged to 100% regularly - no need to stop at 80% for battery health.
How long does the 2025 Chery Tiggo 7 Pro PHEV take to charge?
AC 7.4 kW · 0–100% at 3.3 kW5 h 45 min
AC 22 kW · 0–100% at 3.3 kW5 h 45 min
Rapid 50 kW · 10–80% at up to 50 kW~26 min
Ultra-rapid 150 kW · 10–80% at up to 50 kW~26 min
Ultra-rapid 350 kW · 10–80% at up to 50 kW~26 min
Estimates assume a typical charge curve and a warm battery - cold weather, a nearly-full battery, or a busy shared unit can slow things down.
What does it cost to charge?
Enter your home tariff or a charger's listed rate - costs follow your number and the car's usable battery; per-mile uses the rated range.
Specs: CAOA Chery Tiggo 7 PRO Plug-in Hybrid · via OpenEV Data
Chery - All vehicles