Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map

2024 Chery Omoda 7

Charge times & specs

Specs

PowertrainPlug-in hybrid
Usable battery19 kWh
Battery chemistryLFP
Peak DC rate50 kW
Peak AC rate3.3 kW
Charging architecture400 V
Electric range (CLTC, approx.)62 mi · 100 km
Efficiency (approx.)3.3 mi/kWh · 5.3 km/kWh
Charge-port locationRear left
DrivetrainAll-wheel drive
Power200 kW
ConnectorsType 2

LFP packs are happy being charged to 100% regularly - no need to stop at 80% for battery health.

How long does the 2024 Chery Omoda 7 take to charge?

AC 7.4 kW · 0–100% at 3.3 kW5 h 45 min
AC 22 kW · 0–100% at 3.3 kW5 h 45 min
Rapid 50 kW · 10–80% at up to 50 kW~26 min
Ultra-rapid 150 kW · 10–80% at up to 50 kW~26 min
Ultra-rapid 350 kW · 10–80% at up to 50 kW~26 min

Estimates assume a typical charge curve and a warm battery - cold weather, a nearly-full battery, or a busy shared unit can slow things down.

What does it cost to charge?

Enter your home tariff or a charger's listed rate - costs follow your number and the car's usable battery; per-mile uses the rated range.

Specs: Omoda 7 PHEV Launch · via OpenEV Data

Other model years: 2025

Chery - All vehicles