Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map

2025 Changan Deepal S7 Standard

Charge times & specs

Specs

Usable battery64 kWh
Battery chemistryLFP
Peak DC rate100 kW
Peak AC rate7 kW
Charging architecture400 V
Range (CLTC, approx.)323 mi · 520 km
Efficiency (approx.)5.0 mi/kWh · 8.1 km/kWh
Charge-port locationRear right
DrivetrainRear-wheel drive
Power160 kW
0–62 mph7.5 s
Kerb weight1,950 kg
ConnectorsGB/T

LFP packs are happy being charged to 100% regularly - no need to stop at 80% for battery health.

How long does the 2025 Changan Deepal S7 Standard take to charge?

AC 7.4 kW · 0–100% at 7 kW9 h 9 min
AC 22 kW · 0–100% at 7 kW9 h 9 min
Rapid 50 kW · 10–80% at up to 50 kW~61 min
Ultra-rapid 150 kW · 10–80% at up to 100 kW~43 min
Ultra-rapid 350 kW · 10–80% at up to 100 kW~43 min

Estimates assume a typical charge curve and a warm battery - cold weather, a nearly-full battery, or a busy shared unit can slow things down.

What does it cost to charge?

Enter your home tariff or a charger's listed rate - costs follow your number and the car's usable battery; per-mile uses the rated range.

Specs: Deepal S7 Official Specifications · via OpenEV Data

Other model years: 2024 · 2023

Changan - All vehicles