MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 5 Apr 2026
Metrocentre Green Car Park · Zest Charging
St Michael's Way, NE11 9YG
Rate this charger
Network: Zest Charging
Always check directly with the charge point operator for the most up-to-date information.
Connectors
60 kW1 socket
60 kW1 socket
Location info
Facilities
Car park
Reviews
No reviews yet - be the first to review this charger.
Common questions
How fast is charging at Metrocentre Green Car Park · Zest Charging?
Up to 60 kW DC via CCS.
How many charging sockets does Metrocentre Green Car Park · Zest Charging have?
4 charging sockets: 1 × 60 kW CCS, 1 × 60 kW CCS.
Who operates Metrocentre Green Car Park · Zest Charging?
Metrocentre Green Car Park · Zest Charging is on the Zest Charging network. For site issues, the operator lists +44 333 577 6760.
How long does a Tesla Model Y Long Range take to charge at Metrocentre Green Car Park · Zest Charging?
A typical 10–80% rapid charge takes about 58 min on the 60 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Metrocentre Green Car Park · Zest Charging?
A typical 10–80% rapid charge takes about 43 min on the 60 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Metrocentre Green Car Park · Zest Charging?
A typical 10–80% rapid charge takes about 57 min on the 60 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 60 kW CCS~58 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 60 kW CCS~43 min
Audi Q4 e-tron 50 10–80% · 60 kW CCS~57 min
Hyundai IONIQ 5 10–80% · 60 kW CCS~53 min
MG Motor MG4 Trophy 10–80% · 60 kW CCS~47 min
Hyundai Kona Electric Long Range 10–80% · 60 kW CCS~49 min
Estimates assume a typical charge curve and a warm battery.
Data: Open Charge Map · verified 5 Apr 2026