Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 5 Apr 2026

32 New Street · Zest Charging

New Street, CA28 7DY
Rate this charger
Network: Zest Charging
Always check directly with the charge point operator for the most up-to-date information.
Connectors
Type 243 kW4 sockets
CCS75 kW4 sockets
Location info
AccessPublic · membership required · access key required
Reviews
No reviews yet - be the first to review this charger.
Common questions
How fast is charging at 32 New Street · Zest Charging?

Up to 75 kW DC via Type 2, CCS.

How many charging sockets does 32 New Street · Zest Charging have?

1 charging socket: 4 × 43 kW Type 2, 4 × 75 kW CCS.

Who operates 32 New Street · Zest Charging?

32 New Street · Zest Charging is on the Zest Charging network. For site issues, the operator lists +44 333 577 6760.

How long does a Tesla Model Y Long Range take to charge at 32 New Street · Zest Charging?

A typical 10–80% rapid charge takes about 47 min on the 75 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 32 New Street · Zest Charging?

A typical 10–80% rapid charge takes about 35 min on the 75 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at 32 New Street · Zest Charging?

A typical 10–80% rapid charge takes about 49 min on the 75 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 75 kW CCS~47 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 75 kW CCS~35 min
Audi Q4 e-tron 50 10–80% · 75 kW CCS~49 min
Hyundai IONIQ 5 10–80% · 75 kW CCS~43 min
MG Motor MG4 Trophy 10–80% · 75 kW CCS~40 min
Hyundai Kona Electric Long Range 10–80% · 75 kW CCS~43 min
Nissan LEAF 10–80% · 43 kW Type 2~57 min

Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 5 Apr 2026