Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
OfflineCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 11 Aug 2022

The Izaak Walton Hotel · Zero Carbon World

Dovedale, DE6 2AY
Rate this charger
Always check directly with the charge point operator for the most up-to-date information.
Connectors
Type 27 kW1 socket
BS1363 3 Pin 13 Amp3 kW1 socket
Location info
PriceFree for customers
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
AccessPublic
Facilities
Hotel / inn
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at The Izaak Walton Hotel · Zero Carbon World?

The operator's published price is Free for customers. Prices come from the operator's own data feed and can change.

How fast is charging at The Izaak Walton Hotel · Zero Carbon World?

Up to 7 kW AC via Type 2, BS1363 3 Pin 13 Amp.

How many charging sockets does The Izaak Walton Hotel · Zero Carbon World have?

2 charging sockets: 1 × 7 kW Type 2, 1 × 3 kW BS1363 3 Pin 13 Amp.

Who operates The Izaak Walton Hotel · Zero Carbon World?

The Izaak Walton Hotel · Zero Carbon World is on the Zero Carbon World network. For site issues, the operator lists 01335 350981.

How long does a Tesla Model Y Long Range take to charge at The Izaak Walton Hotel · Zero Carbon World?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Izaak Walton Hotel · Zero Carbon World?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at The Izaak Walton Hotel · Zero Carbon World?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 11 Aug 2022