Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 12 May 2024

Porthdinllaen National Trust Car Park · Zero Carbon World

Golf Road, LL53 6BE
Rate this charger
Always check directly with the charge point operator for the most up-to-date information.
Connectors
Type 27 kW1 socket
CCS–1 socket
Location info
PriceFree for members £4 if not
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
AccessPublic
Facilities
Car park
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Porthdinllaen National Trust Car Park · Zero Carbon World?

The operator's published price is Free for members £4 if not. Prices come from the operator's own data feed and can change.

How fast is charging at Porthdinllaen National Trust Car Park · Zero Carbon World?

Up to 7 kW AC via Type 2, CCS.

How many charging sockets does Porthdinllaen National Trust Car Park · Zero Carbon World have?

1 charging socket: 1 × 7 kW Type 2, 1 × CCS.

Who operates Porthdinllaen National Trust Car Park · Zero Carbon World?

Porthdinllaen National Trust Car Park · Zero Carbon World is on the Zero Carbon World network. For site issues, the operator lists 01690 713317.

How long does a Tesla Model Y Long Range take to charge at Porthdinllaen National Trust Car Park · Zero Carbon World?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Porthdinllaen National Trust Car Park · Zero Carbon World?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Porthdinllaen National Trust Car Park · Zero Carbon World?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 12 May 2024