Barrack Road · Wenea
How much does it cost to charge at Barrack Road · Wenea?
The operator's published price is £0.55/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Barrack Road · Wenea?
Up to 40 kW DC via CCS.
How many charging sockets does Barrack Road · Wenea have?
4 charging sockets: 1 × 40 kW CCS, 1 × 40 kW CCS, 1 × 40 kW CCS, 1 × 40 kW CCS.
Who operates Barrack Road · Wenea?
Barrack Road · Wenea is on the Wenea network.
How long does a Tesla Model Y Long Range take to charge at Barrack Road · Wenea?
A typical 10–80% rapid charge takes about 87 min on the 40 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Barrack Road · Wenea?
A typical 10–80% rapid charge takes about 63 min on the 40 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Barrack Road · Wenea?
A typical 10–80% rapid charge takes about 81 min on the 40 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.