MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 17 Oct 2024
Park Centre · Weev
Donegall Road, BT12 6HN
Rate this charger
Network: Weev
Always check directly with the charge point operator for the most up-to-date information.
Connectors
11 kW2 sockets
120 kW2 sockets
24 kW1 socket
Location info
AccessPublic · membership required · access key required
Phone+44 29 9031 3031
Getting thereAccess during car park opening hours. Car park closes at 9pm daily
Find itStreet View of this spot ↗
Reviews
No reviews yet - be the first to review this charger.
Common questions
How fast is charging at Park Centre · Weev?
Up to 120 kW DC via Type 2, CCS.
How many charging sockets does Park Centre · Weev have?
5 charging sockets: 2 × 11 kW Type 2, 2 × 120 kW CCS, 1 × 24 kW CCS.
Who operates Park Centre · Weev?
Park Centre · Weev is on the Weev network. For site issues, the operator lists +44 29 9031 3031.
How long does a Tesla Model Y Long Range take to charge at Park Centre · Weev?
A typical 10–80% rapid charge takes about 31 min on the 120 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Park Centre · Weev?
A typical 10–80% rapid charge takes about 26 min on the 120 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Park Centre · Weev?
A typical 10–80% rapid charge takes about 40 min on the 120 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 120 kW CCS~31 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 120 kW CCS~26 min
Audi Q4 e-tron 50 10–80% · 120 kW CCS~40 min
Hyundai IONIQ 5 10–80% · 120 kW CCS~27 min
MG Motor MG4 Trophy 10–80% · 120 kW CCS~32 min
Hyundai Kona Electric Long Range 10–80% · 120 kW CCS~39 min
Nissan LEAF 10–80% · 11 kW Type 2~4h 15m
Estimates assume a typical charge curve and a warm battery.
Data: Open Charge Map · verified 17 Oct 2024