Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
No live statusCommunity dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 2 Nov 2023

VendElectric St Helena Hospice

Myland Hall Chase, CO4 9JU
Rate this charger
Network: Vend Electric
Always check directly with the charge point operator for the most up-to-date information.
Connectors
Type 222 kW4 sockets
Location info
PriceFrom 42 pence per kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
AccessPublic
Notes2 units spaced separately. Bays not marked for ev. One is located next to a disabled bay.
Getting thereOpen 24 hours
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at VendElectric St Helena Hospice?

The operator's published price is From 42 pence per kWh. Prices come from the operator's own data feed and can change.

How fast is charging at VendElectric St Helena Hospice?

Up to 22 kW AC via Type 2.

How many charging sockets does VendElectric St Helena Hospice have?

2 charging sockets: 4 × 22 kW Type 2.

Who operates VendElectric St Helena Hospice?

VendElectric St Helena Hospice is on the Vend Electric network. For site issues, the operator lists 01205 724 754.

How long does a Tesla Model Y Long Range take to charge at VendElectric St Helena Hospice?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at VendElectric St Helena Hospice?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at VendElectric St Helena Hospice?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 22 kW Type 2~5h 2m
Tesla Model 3 Rear-Wheel Drive 10–80% · 22 kW Type 2~3h 38m
Audi Q4 e-tron 50 10–80% · 22 kW Type 2~4h 39m
Hyundai IONIQ 5 10–80% · 22 kW Type 2~4h 37m
MG Motor MG4 Trophy 10–80% · 22 kW Type 2~3h 53m
Hyundai Kona Electric Long Range 10–80% · 22 kW Type 2~5h 38m
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 2 Nov 2023