Ubitricity Three Colt Street Junc. Grenade Street, Three
Type 2 · 5 kW100% reliability1 of 2 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at Ubitricity Three Colt Street Junc. Grenade Street, Three?
The operator's published price is £0.39/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Ubitricity Three Colt Street Junc. Grenade Street, Three?
Up to 5 kW AC via Type 2.
How many charging sockets does Ubitricity Three Colt Street Junc. Grenade Street, Three have?
2 charging sockets: 2 × 5 kW Type 2. Live per-socket availability is shown on this page.
Is Ubitricity Three Colt Street Junc. Grenade Street, Three open 24/7?
Yes - Ubitricity Three Colt Street Junc. Grenade Street, Three is open 24 hours a day, 7 days a week.
When is Ubitricity Three Colt Street Junc. Grenade Street, Three busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 11 pm and quietest around 1 pm. The live status on this page shows what is free before you set off.
How reliable is Ubitricity Three Colt Street Junc. Grenade Street, Three?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 26 observed charging sessions.
Who operates Ubitricity Three Colt Street Junc. Grenade Street, Three?
Ubitricity Three Colt Street Junc. Grenade Street, Three is on the Ubitricity network.
How long does a Tesla Model Y Long Range take to charge at Ubitricity Three Colt Street Junc. Grenade Street, Three?
A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh (~£22 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Ubitricity Three Colt Street Junc. Grenade Street, Three?
A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh (~£16 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Ubitricity Three Colt Street Junc. Grenade Street, Three?
A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh (~£20 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.