Ubitricity College Gardens outside Fire Station
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at Ubitricity College Gardens outside Fire Station?
The operator's published price is £0.56/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Ubitricity College Gardens outside Fire Station?
Up to 5 kW AC via Type 2.
How many charging sockets does Ubitricity College Gardens outside Fire Station have?
1 charging socket: 1 × 5 kW Type 2. Live per-socket availability is shown on this page.
Is Ubitricity College Gardens outside Fire Station open 24/7?
Yes - Ubitricity College Gardens outside Fire Station is open 24 hours a day, 7 days a week.
How reliable is Ubitricity College Gardens outside Fire Station?
Amp Map measured 100% uptime here from recorded live status over the last 30 days.
Who operates Ubitricity College Gardens outside Fire Station?
Ubitricity College Gardens outside Fire Station is on the Ubitricity network.
How long does a Tesla Model Y Long Range take to charge at Ubitricity College Gardens outside Fire Station?
A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Ubitricity College Gardens outside Fire Station?
A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh (~£22 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Ubitricity College Gardens outside Fire Station?
A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh (~£29 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.