Ubitricity Bromley High Street, Henshall Point, Bromley
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at Ubitricity Bromley High Street, Henshall Point, Bromley?
The operator's published price is £0.39/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Ubitricity Bromley High Street, Henshall Point, Bromley?
Up to 5 kW AC via Type 2.
How many charging sockets does Ubitricity Bromley High Street, Henshall Point, Bromley have?
1 charging socket: 1 × 5 kW Type 2. Live per-socket availability is shown on this page.
Is Ubitricity Bromley High Street, Henshall Point, Bromley open 24/7?
Yes - Ubitricity Bromley High Street, Henshall Point, Bromley is open 24 hours a day, 7 days a week.
When is Ubitricity Bromley High Street, Henshall Point, Bromley busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 6 pm and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is Ubitricity Bromley High Street, Henshall Point, Bromley?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 1 observed charging session.
Who operates Ubitricity Bromley High Street, Henshall Point, Bromley?
Ubitricity Bromley High Street, Henshall Point, Bromley is on the Ubitricity network.
How long does a Tesla Model Y Long Range take to charge at Ubitricity Bromley High Street, Henshall Point, Bromley?
A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh (~£22 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Ubitricity Bromley High Street, Henshall Point, Bromley?
A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh (~£16 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Ubitricity Bromley High Street, Henshall Point, Bromley?
A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh (~£20 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.