Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
Available · 1 of 1VerifiedUbitricity supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 8 Oct 2026

Ubitricity 6 Windermere Avenue

6 Windermere Avenue, NW6 6LN · Open 24h
Rate this charger
Network: Ubitricity
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
suby1100008219Type 2 · 5 kW100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
HoursOpen 24 hours
Energy100% renewable energy
PaymentApp start/stop
6am9am12pm3pm6pm9pm
From live status history · busiest around 11pm
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at Ubitricity 6 Windermere Avenue?

The operator's published price is £0.56/kWh. Prices come from the operator's own data feed and can change.

How fast is charging at Ubitricity 6 Windermere Avenue?

Up to 5 kW AC via Type 2.

How many charging sockets does Ubitricity 6 Windermere Avenue have?

1 charging socket: 1 × 5 kW Type 2. Live per-socket availability is shown on this page.

Is Ubitricity 6 Windermere Avenue open 24/7?

Yes - Ubitricity 6 Windermere Avenue is open 24 hours a day, 7 days a week.

When is Ubitricity 6 Windermere Avenue busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 10 pm and quietest around noon. The live status on this page shows what is free before you set off.

How reliable is Ubitricity 6 Windermere Avenue?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 4 observed charging sessions.

Who operates Ubitricity 6 Windermere Avenue?

Ubitricity 6 Windermere Avenue is on the Ubitricity network.

How long does a Tesla Model Y Long Range take to charge at Ubitricity 6 Windermere Avenue?

A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Ubitricity 6 Windermere Avenue?

A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh (~£22 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Ubitricity 6 Windermere Avenue?

A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh (~£29 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 5 kW Type 2~11h 4m · ≈ 55 kWh · ~£31
Tesla Model 3 Rear-Wheel Drive 10–80% · 5 kW Type 2~7h 59m · ≈ 40 kWh · ~£22
Audi Q4 e-tron 50 10–80% · 5 kW Type 2~10h 13m · ≈ 51 kWh · ~£29
Hyundai IONIQ 5 10–80% · 5 kW Type 2~10h 10m · ≈ 51 kWh · ~£28
MG Motor MG4 Trophy 10–80% · 5 kW Type 2~8h 32m · ≈ 43 kWh · ~£24
Hyundai Kona Electric Long Range 10–80% · 5 kW Type 2~8h 7m · ≈ 41 kWh · ~£23
Nissan LEAF 10–80% · 5 kW Type 2~5h 36m · ≈ 28 kWh · ~£16

Estimates assume a typical charge curve and a warm battery.

Data: Ubitricity · synced 8 Oct 2026