Ubitricity 59 Agate Road, O S No 59
Type 2 · 5 kW59% reliability1 of 2 available
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at Ubitricity 59 Agate Road, O S No 59?
The operator's published price is £0.56/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Ubitricity 59 Agate Road, O S No 59?
Up to 5 kW AC via Type 2.
How many charging sockets does Ubitricity 59 Agate Road, O S No 59 have?
2 charging sockets: 2 × 5 kW Type 2. Live per-socket availability is shown on this page.
Is Ubitricity 59 Agate Road, O S No 59 open 24/7?
Yes - Ubitricity 59 Agate Road, O S No 59 is open 24 hours a day, 7 days a week.
How reliable is Ubitricity 59 Agate Road, O S No 59?
Amp Map measured 59.4% uptime here from recorded live status over the last 30 days.
Who operates Ubitricity 59 Agate Road, O S No 59?
Ubitricity 59 Agate Road, O S No 59 is on the Ubitricity network.
How long does a Tesla Model Y Long Range take to charge at Ubitricity 59 Agate Road, O S No 59?
A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Ubitricity 59 Agate Road, O S No 59?
A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh (~£22 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Ubitricity 59 Agate Road, O S No 59?
A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh (~£29 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.