Reliability is the share of time each socket was not out of order, over the last 30 days.
| Rate | Hours | Price | Current |
|---|---|---|---|
| Off-peak | 00:00–07:00 | £0.45/kWh | |
| Peak | 07:00–00:00 | £0.56/kWh |
How much does it cost to charge at ubitricity Distributed Energy Systems UK Ltd. 32 Hazlitt Road, Outside No 32?
The operator's published price is £0.45–£0.67/kWh · varies by time of day. Prices come from the operator's own data feed and can change.
How fast is charging at ubitricity Distributed Energy Systems UK Ltd. 32 Hazlitt Road, Outside No 32?
Up to 5 kW AC via Type 2.
How many charging sockets does ubitricity Distributed Energy Systems UK Ltd. 32 Hazlitt Road, Outside No 32 have?
1 charging socket: 1 × 5 kW Type 2. Live per-socket availability is shown on this page.
Is ubitricity Distributed Energy Systems UK Ltd. 32 Hazlitt Road, Outside No 32 open 24/7?
Yes - ubitricity Distributed Energy Systems UK Ltd. 32 Hazlitt Road, Outside No 32 is open 24 hours a day, 7 days a week.
When is ubitricity Distributed Energy Systems UK Ltd. 32 Hazlitt Road, Outside No 32 busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 10 pm and quietest around 11 am. The live status on this page shows what is free before you set off.
How reliable is ubitricity Distributed Energy Systems UK Ltd. 32 Hazlitt Road, Outside No 32?
Amp Map measured 99.9% uptime here from recorded live status over the last 30 days, across 18 observed charging sessions.
Who operates ubitricity Distributed Energy Systems UK Ltd. 32 Hazlitt Road, Outside No 32?
ubitricity Distributed Energy Systems UK Ltd. 32 Hazlitt Road, Outside No 32 is on the Ubitricity network.
How long does a Tesla Model Y Long Range take to charge at ubitricity Distributed Energy Systems UK Ltd. 32 Hazlitt Road, Outside No 32?
A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at ubitricity Distributed Energy Systems UK Ltd. 32 Hazlitt Road, Outside No 32?
A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh (~£22 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at ubitricity Distributed Energy Systems UK Ltd. 32 Hazlitt Road, Outside No 32?
A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh (~£29 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.