ubitricity Distributed Energy Systems UK Ltd. 30 Mere Road
| Rate | Hours | Price | Current |
|---|---|---|---|
| Off-peak | 00:00–07:00 | £0.45/kWh | |
| Peak | 07:00–00:00 | £0.56/kWh |
How much does it cost to charge at ubitricity Distributed Energy Systems UK Ltd. 30 Mere Road?
The operator's published price is £0.45–£0.67/kWh · varies by time of day. Prices come from the operator's own data feed and can change.
How fast is charging at ubitricity Distributed Energy Systems UK Ltd. 30 Mere Road?
Up to 5 kW AC via Type 2.
How many charging sockets does ubitricity Distributed Energy Systems UK Ltd. 30 Mere Road have?
1 charging socket: 1 × 5 kW Type 2. Live per-socket availability is shown on this page.
Is ubitricity Distributed Energy Systems UK Ltd. 30 Mere Road open 24/7?
Yes - ubitricity Distributed Energy Systems UK Ltd. 30 Mere Road is open 24 hours a day, 7 days a week.
When is ubitricity Distributed Energy Systems UK Ltd. 30 Mere Road busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 11 pm and quietest around 9 am. The live status on this page shows what is free before you set off.
Who operates ubitricity Distributed Energy Systems UK Ltd. 30 Mere Road?
ubitricity Distributed Energy Systems UK Ltd. 30 Mere Road is on the Ubitricity network.
How long does a Tesla Model Y Long Range take to charge at ubitricity Distributed Energy Systems UK Ltd. 30 Mere Road?
A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh (~£25 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at ubitricity Distributed Energy Systems UK Ltd. 30 Mere Road?
A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh (~£18 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at ubitricity Distributed Energy Systems UK Ltd. 30 Mere Road?
A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh (~£23 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.