Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback
Amp Map
MapCharger
FullVerifiedUbitricity supplies this charger’s details directly to Amp Map. Every operator-fed charge point is re-synced nightly.Last synced 2 Nov 2026

ubitricity Distributed Energy Systems UK Ltd. 3 Pollard Road, Outside 3 Castle Court

3 Pollard Road, Outside 3 Castle Court, SM4 6EG · Open 24h
Rate this charger
Network: Ubitricity
Always check directly with the charge point operator for the most up-to-date information.
Sockets · live
scit11241Type 2 · 5 kW99% reliabilityCharging

Reliability is the share of time each socket was not out of order, over the last 30 days.

Location info
Price£0.45–£0.67/kWh · varies by time of day
Price times
RateHoursPriceCurrent
Off-peak00:00–07:00£0.45/kWh
Peak07:00–00:00£0.56/kWh
NotePrices can change — always check the price on the charge point or in the operator's app before starting a charge.
HoursOpen 24 hours
PaymentApp start/stop
6am9am12pm3pm6pm9pm
From live status history · busiest around 10pm
Reviews
No reviews yet - be the first to review this charger.
Common questions
How much does it cost to charge at ubitricity Distributed Energy Systems UK Ltd. 3 Pollard Road, Outside 3 Castle Court?

The operator's published price is £0.45–£0.67/kWh · varies by time of day. Prices come from the operator's own data feed and can change.

How fast is charging at ubitricity Distributed Energy Systems UK Ltd. 3 Pollard Road, Outside 3 Castle Court?

Up to 5 kW AC via Type 2.

How many charging sockets does ubitricity Distributed Energy Systems UK Ltd. 3 Pollard Road, Outside 3 Castle Court have?

1 charging socket: 1 × 5 kW Type 2. Live per-socket availability is shown on this page.

Is ubitricity Distributed Energy Systems UK Ltd. 3 Pollard Road, Outside 3 Castle Court open 24/7?

Yes - ubitricity Distributed Energy Systems UK Ltd. 3 Pollard Road, Outside 3 Castle Court is open 24 hours a day, 7 days a week.

When is ubitricity Distributed Energy Systems UK Ltd. 3 Pollard Road, Outside 3 Castle Court busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 pm and quietest around 9 am. The live status on this page shows what is free before you set off.

How reliable is ubitricity Distributed Energy Systems UK Ltd. 3 Pollard Road, Outside 3 Castle Court?

Amp Map measured 98.6% uptime here from recorded live status over the last 30 days, across 31 observed charging sessions.

Who operates ubitricity Distributed Energy Systems UK Ltd. 3 Pollard Road, Outside 3 Castle Court?

ubitricity Distributed Energy Systems UK Ltd. 3 Pollard Road, Outside 3 Castle Court is on the Ubitricity network.

How long does a Tesla Model Y Long Range take to charge at ubitricity Distributed Energy Systems UK Ltd. 3 Pollard Road, Outside 3 Castle Court?

A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at ubitricity Distributed Energy Systems UK Ltd. 3 Pollard Road, Outside 3 Castle Court?

A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh (~£22 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at ubitricity Distributed Energy Systems UK Ltd. 3 Pollard Road, Outside 3 Castle Court?

A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh (~£29 at the published price). Estimates assume a typical charge curve and a warm battery.

Charge times by car
Charge window10–80%
Tesla Model Y Long Range 10–80% · 5 kW Type 2~11h 4m · ≈ 55 kWh · ~£31
Tesla Model 3 Rear-Wheel Drive 10–80% · 5 kW Type 2~7h 59m · ≈ 40 kWh · ~£22
Audi Q4 e-tron 50 10–80% · 5 kW Type 2~10h 13m · ≈ 51 kWh · ~£29
Hyundai IONIQ 5 10–80% · 5 kW Type 2~10h 10m · ≈ 51 kWh · ~£28
MG Motor MG4 Trophy 10–80% · 5 kW Type 2~8h 32m · ≈ 43 kWh · ~£24
Hyundai Kona Electric Long Range 10–80% · 5 kW Type 2~8h 7m · ≈ 41 kWh · ~£23
Nissan LEAF 10–80% · 5 kW Type 2~5h 36m · ≈ 28 kWh · ~£16

Estimates assume a typical charge curve and a warm battery.

Data: Ubitricity · synced 2 Nov 2026