Ubitricity 28 Dundonald Road
Reliability is the share of time each socket was not out of order, over the last 30 days.
How much does it cost to charge at Ubitricity 28 Dundonald Road?
The operator's published price is £0.56/kWh. Prices come from the operator's own data feed and can change.
How fast is charging at Ubitricity 28 Dundonald Road?
Up to 5 kW AC via Type 2.
How many charging sockets does Ubitricity 28 Dundonald Road have?
1 charging socket: 1 × 5 kW Type 2. Live per-socket availability is shown on this page.
Is Ubitricity 28 Dundonald Road open 24/7?
Yes - Ubitricity 28 Dundonald Road is open 24 hours a day, 7 days a week.
How reliable is Ubitricity 28 Dundonald Road?
Amp Map measured 0% uptime here from recorded live status over the last 30 days.
Who operates Ubitricity 28 Dundonald Road?
Ubitricity 28 Dundonald Road is on the Ubitricity network.
How long does a Tesla Model Y Long Range take to charge at Ubitricity 28 Dundonald Road?
A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Ubitricity 28 Dundonald Road?
A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh (~£22 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Ubitricity 28 Dundonald Road?
A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh (~£29 at the published price). Estimates assume a typical charge curve and a warm battery.
Estimates assume a typical charge curve and a warm battery.